Royal Parade / Cheltenham

Ivor Parnham Building services have recently under taken the specialist building works At Royal Parade, Cheltenham

Our remit involved breaking out back to the concrete the cutting out channels in the tread to the depth of 25mm

Stainless steel hellibags were fixed protruding 20mm to form a grid to add strength to the bullnose.

A mould was installed to form new bull nose noseings then all exposed concrete was painted with a resin to match the epoxy mortar and infilled with expoy mortar to leave a curve. The mould was then removed and the shape of the bullnose was made good.

Works were undertaken to 31 to steps

This unusual and specialist project was completed on time and within all agreed time scales.