SPV Special Projects

Services: Special Projects

SPV Special Projects- Cosmetic Surgery for old buildings. SPV Special Projects offers project design and construction on large-scale renovation projects in the commercial sector. As well as dramatically improving the aesthetics of a building and the surrounding environment, refurbishment projects are very often more economical even when the complete building envelpe needs replacing. We can undertake full design and build renovations of existing Hotel, Leisure and Office Buildings, Schools and Shopping Centres from Architectural Design and Planning Permission to full internal and external building refurbishment and beyond. Our experts are all highly experienced both nationally and on the Continent. For further information on this, please refer to www.spvspecialprojects.com

Special Projects projects:

Albany House

SPV Group, the nationwide refurbishment contractors have recently completed the building envelope works at Albany House, Birmingham. The Office building which is owned and operated by RVB Investments has been refurbished with a new external facade system and new glazing to all elevations.The…

More »

Randolph Hotel

The Macdonald Randolph Hotel, is the leading 5 star Hotel in Oxford. The heritage building is located in the centre of Oxford on Beaumont St occupying a corner site with the Ashmolean Museum opposite the main entrance, with the other side fronting onto St Giles and colleges and the Playhouse…

More »

Tower at The Randolph Hotel

The Macdonald Randolph Hotel, a prestigious 5 star Hotel and a heritage building is located in the centre of Oxford on Beaumont St. It occupies a corner site with the Ashmolean Museum opposite the main entrance, with the other side fronting onto St Giles and colleges and the playhouse theatre a few…

More »

Randolph Hotel

SPV have recently undertaken the reactive works to re open the 5* Randolph hotel in Oxford following the recent fire which broke out at the property. The fire at the 150-year-old building in Beaumont Street was sparked by a flambéed beef stroganoff in its kitchen, ripping through three floors. At…

More »

Iceland store Newcastle

SPV have recently completed the new concept Iceland store at Newcastle under Lyme. This is the first store of the kind for Iceland and will set the prescient for all stores in the future.

More »

Holiday Inn Hotel Bloomsbury

SPV have recently completed the window replacement works at The Holiday Inn Hotel Bloomsbury, London. The contract comprised of the replacement of the existing windows to the bedrooms situated on floors 1, 2, 3, 4 & 5 to all elevations of the Hotel using new polyester powder coated double glazed…

More »

Castle Meadow Retail Park

SPV have recently completed the steelwork and over cladding works at Units 2, 3 and 4, Castle Meadow Retail Park, Nottingham. The internal diagonal bracings were first removed then new steelwork was installed to compensate. New feature cladding was then installed including Kingspan Cladding, Corus…

More »

Odeon Cinema

SPV Special Projects have recently completed the complete internal and external refurbishment of the Odeon Cinema, Glasgow Quay. The existing facades and signage were removed, a new steelwork frame ws installed and overlcad, the Foyer of the Cinema was refurbished and the signage to the front…

More »

Interbuild 2008

SPV Special Projects have recently exhibited at Interbuild 08 at the NEC from the 26th-30th October 2008. The SPV Special Projects stand was designed by Satellite Architects specifically for the exhibtion to showcase all consortium members products and services and was built by SPV Group. The SPV…

More »

Crowne Plaza

SPV have recently completed the external refurbishment works at The Crowne Plaza Hotel, Manchester Airport. The first phase of the project involved the erection of scaffolding to carry out the works, overcladding of the existing concrete framed panel building using Ash and Lacy aluminum cladding…

More »

Holiday Inn

SPV have recently completed the extensive external refurbishment project at The Holiday Inn Hotel, Cardiff Centre. The project involved the erection of scaffolding to all elevations to carry out the works, the strip out of all asbestos materials, the overcladding of the entire building, the…

More »