SPV have recently completed the roofing works at New Hall Primary & Children’s Centre.
The project involved the installation of scaffolding for safe access to the works complete with a host for raising and lowering of materials.
SPV then supplied and laid a tapered insulation system to the roof area to reduce the ponding water on the roof followed by a 2 layer high performance fire resistant roofing felt system complete with all details, flashings and finishes.
All works were completed within budget and ahead of programme and were covered by a 10 year insurance backed warranty.