
SPV are currently undertaking the refurbishment of the Seventh Day Adventist Church in Manchester.
The contract involves roofing works, cladding works and the replcement of both windows and the doors to the building.
Piz panels are being installed to all elevations of the building to provide a sleek, modern look to the building.
The roof is being overlayed using a cut to falls insulation system and a single ply roofing membrane.
The existing timber windows are being replaced with new plastic windows and the existing timber door is being replaced with a new upvc double door.